Abstract:
This project made to make a design of asphalt roads of 4.27 km at Misibya- Ruharabuge site in
Nyarugenge district, Kigali sector. The specific objectives of the study were to produces
topographic map of the case study, to design suitable horizontal alignment, vertical alignment,
cross sections of road which will facilitate these trucks and heavy vehicles and to calculate and
specify the earthwork quantities (cut and fill volume). The topographic analysis of Nyarugenge
District identifies 4 distinct features: Areas of gentle slopes (less than 20 percent gradient) on the
ridges and along the wetlands; areas with steep slopes (more than 20 percent gradient); linear
ridges running along the length of the sectors; alluvial plains along the rivers Nyabarongo and
Nyabugogo. In this project, researcher collected data by using modern surveying instrument like
total station, dump level et c. Laptop with engineering software CAD (computer aided design)
which will occupy those topographic that for analysis and transformation to many formats.
ArcGIS software for analyzing a spatial location and decision making after buffering the
delimitation area for computing a number of people will be expropriated with a project
AutoCAD CIVIL 3D which will be used to export and draw geometrical element of road which
cross section, longitudinal section, plan view, and topographic map of the field. The average
elevation of Nyarugenge District is 1,000 m above the sea level. Mount Kigali, the highest point
in Kigali, has an elevation of 1,853m and the highest spot in Mageragere Sector has an elevation
of 1,810 m. Due to such hilly topography coupled with large scale deforestation, soil erosion and
landslides in the District are key recurrent problems faced by the City, which requires adequate
soil protection measures to address this issue. Focused on the analysis of finding, our objectives
was successfully achieved and showed that the existing road elements do not meet the standard
road design to be used due to its damages which are lack of drainage system and other items
listed in this work. With design of geometrical element of Misibya- Ruharabuge site in
Nyarugenge district, Kigali sector asphalt makes the road usable in good conditions and if its
maintenance is well done; handle travelling treats for users will achieve. For earthworks
quantities, entered data in technical mapping system come across with a paradox phenomenon
which issued by total station that affects of the road project implementation due to the increase
of earthworks computation varied according to the use of different cross sectional intervals. The
construction of this road is important to the Misibya- Ruharabuge site. Although a high rate of
development in this site, there still problems caused by inappropriate road designed which are
inhibit access to social facilities and commercial activities. This road helps to overcome those
challenges.